ChevyMan.ru
Mazda Mitsubishi Toyota Land Rover Honda Kia Nissan
English Русский
Български
Беларускі
Український
Српски
Hrvatski
Română
Polski
Slovenský
Magyar
|
Articles | Sitemap | Contacts | Search:
 
 
 
 
 
 
 
 
Home   Aveo   Captiva   Cruze   Lacetti   Lanos   Niva   Tahoe   Others  
Lacetti 1 (2002-2009)
  • Home
  • Lacetti
  • J200 (2002-2009)
  • Power unit
  • Supply system
  • Removal the valve and vacuum reservoir of the variable …

Removal the valve and vacuum reservoir of the variable intake tract system (Chevrolet Lacetti J200)

            0

We remove the valve and vacuum reservoir of the engine intake tract length change system for replacement if they fail. We remove the engine cover.

By pressing the locking device of the engine management system wiring harness connector…

By pressing the locking device of the engine management system wiring harness connector…


…disconnect the block from the valve connector.

…disconnect the block from the valve connector.


We remove the rubber tip of the vacuum supply tube to the pneumatic chamber of the system's actuator from the valve fitting.

Having disconnected the rubber hose of the vacuum reservoir from the upper fitting of the valve, press the valve retainer in the direction of the arrow (shown in the photo)…

Having disconnected the rubber hose of the vacuum reservoir from the upper fitting of the valve,…


…we move the valve down along the bracket guide and remove it.


…we move the valve down along the bracket guide and remove it.


Having loosened the clamp, we remove the vacuum reservoir of the system from it.

We install the electromagnetic valve and the vacuum reservoir of the intake tract length variation system in the reverse order.

The article was checked: Vladimir Romannikov
This article is available at russian, bulgarian, belarusian, ukrainian, serbian, croatian, romanian, polish, slovak, hungarian

Share information:

Previous articles
Lacetti 1: Supply system
Next articles

Removal the recirculation valve
Replacing the throttle cable
Removal the purge valve of the adsorber
Removal the fuel vapor recovery system canister
Removal the fuel tank


See similar articles on the topic of Chevrolet cars:
Checking the level and adding brake fluid to the brake system and clutch reservoir Chevrolet Aveo T300 (2012-2018)
Replacing the variable valve timing drive — row 2 (left side), intake Chevrolet Captiva 1 (2006-2018)
Removal and installation the electromagnetic valve of the intake manifold flap drive Chevrolet Cruze 1 (2008-2016)
Removal the exhaust gas recirculation valve Chevrolet Lanos T150 (2002-2009)
Electronic anti-theft system Chevrolet Niva 1 (2002-2016)
Variable valve timing system Chevrolet Tahoe 2 and 3 (2000-2014)
Automatic variable valve timing system Chevrolet Orlando 1 (2010-2018)
Link in different formats to this page
TextHTMLBB Code


Visitor comments

No comments yet


How much will 48 + 31 =

       



Lacetti 1 (2002-2009) 
  • General information
  • User manual
  • Maintenance
  • Power unit
  • Engine repair
  • Control system
  • Supply system
  • Cooling system
  • Exhaust system
  • Transmission
  • Clutch
  • Manual gearbox
  • Front wheel drives
  • Chassis
  • Front suspension
  • Rear suspension
  • Steering
  • Brake system
  • Body
  • Repair of body elements
  • Heating and air conditioning
  • Electrical equipment
  • Engine electrics
  • Lighting and lamps
  • Equipment and devices
  • Electrical circuits

 

ChevyMan.ru © 2017-2025 · Mobile version · Feedback · Site search · Interesting to read · Sitemap: EN BG BY UA RS HR RO PL SK HU

Aveo 2003-2008 · Aveo 2006-2011 · Aveo 2012-2018 · Captiva 2006-2018 · Cruze 2008-2016 · Lacetti 2002-2009 · Lanos 2002-2009 · Niva 2002-2016 · Tahoe 1992-2000 · Tahoe 2000-2014 · Lumina 1 1989-1994 · Trailblazer 1 2001-2008 · Orlando 1 2010-2018 ·