Contents: Removal ↧ Installation ↧
Removal
Disengage and detach covers 1 and 3 (Fig. 8-85) from the floor tunnel lining 5.
Unscrew handles 2 and 4 of the gearbox and transfer case.
Remove the gearbox and transfer case handles together with the covers
Figure 8-85. Gearbox and transfer case handles:
1 - case;
2 - transfer case handle;
3 - case;
4 - gearshift handle;
5 - floor tunnel lining.
Installation
Install the gearbox and transfer case handles in the reverse order of removal.
(Information taken from the official website: «chevyman.ru»)
