Contents: Removal procedure ↧ Installation procedure ↧
Removal procedure
1. Disconnect the negative battery cable.
2. Disconnect the front Evaporative Canister Purge Hose from the Evaporative Canister Purge Solenoid Valve.
3. Disconnect the front Evaporative Coolant Canister Purge Hose from the Evaporative Coolant Canister Pipe.

4. Disconnect the rear hose of the EGR pipe from the EGR canister.

5. Remove the protective bracket of the SUPB adsorber pipe.
6. Remove the fastening clamps of the SUPB adsorber pipe.
7. Remove the SUPB adsorber pipe.

Installation procedure
1. Install the SUPB adsorber pipe using mounting clamps.
2. Install the mounting clamps for the SUPB adsorber pipe.
3. Install the protective bracket for the SUPB adsorber pipe.

4. Connect the rear hose of the EGR pipe to the EGR canister.

5. Connect the front ECU canister purge hose to the ECU canister pipe.
6. Connect the front Evaporative Canister Purge Hose to the Evaporative Canister Purge Solenoid Valve.

(The original text can be found on the website «ChevyMan»)
